Building D

Building D: Addition and Renovation, February 2013 - December 2014

The addition and renovation work on Building D, as outlined in the Master Plan, has begun.

The east end of Building D is fenced off and 4 exit doors are closed. See Map PDF.

Please be safe: Do not walk on the ring road (Kris Howard Blvd) to get from Lot 7 to Building D. Use the detour through Building I or park in Lot 8 and use the sidewalk by the Observatory.

Watch for trucks entering from the Construction Access Road at the intersection of the Inner Ring Road and Kris Howard Blvd.

Status:

 See Map PDF of construction zone. See Map PDF of closed exits.


 

 

Building D – Addition Phase 1, February 2013 - December 2014

Scope: Construct the structural components for the two-story plus basement addition to the east end of Building D.

Project plan:

  • Install additional exits on north side of existing Building D.  See Map PDF.
  • Close select exits on south side of D Building. See Map PDF.
  • Close the sidewalk between Lot 7 and the Quad. See Map PDF.
  • Install safety fence around the Phase 1 construction site. See Map PDF.
  • Demolish east exit halls D199a and D299d.
  • Perform earthwork for new building pad and excavations for basement areas.
  • Install concrete foundations and structural steel framework.
  • Extend utilities to serve the building addition.
  • Building envelope, interior work, and site improvements will follow in the next phase.

Access to campus from Lots 6 & 7 will be rerouted through Building I. Follow signage.

See Map PDF of construction zone.

 

 
Last Updated: 5/3/13